SN
AREA
DISTRICT
ACTIVITY NAME
AMOUNT OUTLAY
EXP. 2019-20
1
Ib Valley
Jharsuguda
Construction of three nos class room at Ekatali up school Jharsuguda
                 
15.01
           
12.76
2
Ib Valley
Jharsuguda
Construction of class room at Mirdhadera 
                   
9.80
              
9.79
3
Ib Valley
Jharsuguda
Construction of boundary wall & toilet at Chhualiberna Ashram school
                 
12.99
              
5.00
4
Ib Valley
Jharsuguda
Supply of drinking water through water tanker at Madhuban Nagar, Sanjob Khadippada & Budhapada under CSR  locp
                   
4.86
              
0.77
5
Ib Valley
Jharsuguda
Supply of drinking water  to Chingriguda village near SOCP, Ib valley area 
                   
4.98
              
0.61
6
Ib Valley
Jharsuguda
Supply of drinking water to water scarcity village near socp
                   
7.28
              
7.28
7
Ib Valley
Jharsuguda
Supply of drinking water to village Lajkura near SOCP of Ib valley area
                   
3.76
              
2.56
8
Ib Valley
Jharsuguda
Supply of drinking water through water tanker at Madhuban Nagar, Sanjob Khadiapada & Budha pada village of Ib valley area
                   
4.91
              
4.09
9
Ib Valley
Jharsuguda
Providing bore well with submersible pump at Buropada Mundapada Lucharapada and Madhuban Nagar 
                   
4.77
              
2.20
10
Ib Valley
Jharsuguda
Supply of drinking water through water tanker with VTM to different village of Brajrajnagar Municipality.
                   
2.41
              
2.09
11
Ib Valley
Jharsuguda
Supply of drinking water to village Lajkura near socp 
                   
3.76
              
1.09
12
Ib Valley
Jharsuguda
Urban Tree Plantation at Jharsuguda
              
402.47
         
106.69
13
Ib Valley
Jharsuguda
Construction of temporary sand bandha on the bed of Ib river near Deogaon Rajpur village under CSR Ib valley area.
                   
5.82
              
4.69
14
Ib Valley
Jharsuguda
Construction of reception centre cum rest shed for Senior citizen/distress and general public in dist police office under CSR.
                 
20.20
              
2.97
15
Ib Valley
Jharsuguda
Construction of cement concrete road from D D Sai house to Basundhra river via Bhimbuda location of Barpali Bartika under Chandimal GP
                 
16.62
              
0.01
16
Ib Valley
Jharsuguda
Construction of community centre building at Mirdhadera under CSR
                 
17.92
           
17.91
17
Ib Valley
Jharsuguda
Construction of concrete road from Remja village to Gandghora village under CSR
                 
15.92
           
15.90
18
Ib Valley
Jharsuguda
Construction of temp sand bandha on bed of Ib river near Deogaon for 2019-20.
                   
7.24
              
7.24
19
Ib Valley
Jharsuguda
Supply of face mask ,sanitizer & sodium hypochloride
                 
10.68
           
10.68
20
Ib Valley
Jharsuguda
Supply of washable mask .
                 
12.37
           
12.37
21
Ib Valley
Jharsuguda
Supply of washable mask .
                 
12.37
           
12.37
22
Ib Valley
Jharsuguda
Supply of blanket, daily utilities etc
                   
1.25
              
0.45
23
Ib Valley
Jharsuguda
Celebration of swachhta hi seva
                   
1.20
              
0.80
24
Ib Valley
Jharsuguda
Supply of sodium hypochlorite 
                   
0.41
              
0.41
25
Ib Valley
Jharsuguda
Supply of man power for sanitation under CSR
                   
0.80
              
0.80
26
Ib Valley
Jharsuguda
Observation of bharat ka Amrut Mahotsav to mark 75 years of India's independence at Ib valley area
                   
1.19
              
0.40
27
Ib Valley
Jharsuguda
Supply of bleaching powder
                   
1.00
              
1.00
28
Orient
Jharsuguda
Construction of Building Hall for SAMS (Students Academic Management System) at Brajrajnagar College, Brajrajnagar under CSR by Orient Area.
                 
13.47
              
1.44
29
Orient
Jharsuguda
Running & operation of 2 nos Piyao 
                   
0.58
              
0.58
30
Orient
Jharsuguda
Supply of spraying machine 
                   
0.25
              
0.25
31
Orient
Jharsuguda
Sanitisation of different colonies of MCL nearby villages manually by portable hand held operated machine to contain the spread of Covid 19 under OA
                   
2.29
              
2.29
32
Orient
Jharsuguda
Construction of one class room and boundary wall at Jananimunda Primary School under CSR works of Orient Area
                   
7.55
              
7.69
33
Orient
Jharsuguda
Community based work by Mahila Mandal
                   
1.00
              
1.00
34
Orient
Jharsuguda
Supply of hand sanitizer 
                   
0.46
              
0.46
35
Orient
Jharsuguda
Supply of hand sanitizer 
                   
1.40
              
1.40
36
Orient
Jharsuguda
Supply of bleaching powder 
                   
1.12
              
1.12
37
Orient
Jharsuguda
Supply of cotton face mask (8900 nos)
                   
2.64
              
2.64
38
Orient
Jharsuguda
Supply of hand sanitizers 180 ml bottle 3000 nos. 
                   
0.69
              
0.69
39
Orient
Jharsuguda
Supply of cotton face mask (5500 nos) 
                   
0.35
              
0.35
40
Lakhanpur
Jharsuguda
Development of basic infrastructure Negipali site for resettlement of poor Sukhbasi families of affected villages of Lakhanpur Area
                 
76.77
           
67.33
41
Lakhanpur
Jharsuguda
Supply of drinking water to village Tingismal at LKP OCP under LKPA (AP-5)
                   
5.51
              
4.74
42
Lakhanpur
Jharsuguda
Supply of drinking water to villages Luhurapada & Sahajbahal at LKP OCP under LKPA (AP-3)
                   
5.33
              
3.88
43
Lakhanpur
Jharsuguda
Supply of drinking water to village Ubuda at LKP OCP under LKPA (AP-4)
                   
5.51
              
4.02
44
Lakhanpur
Jharsuguda
Construction of CC Road Andhapara (Pada no 1) at Kushraloi Gram Panchayat
                   
5.42
              
5.00
45
Lakhanpur
Jharsuguda
Construction of new building along with rep. of existing building & water supply to PUPS at Bandhabahal.
                   
6.12
              
0.70
46
Lakhanpur
Jharsuguda
Construction of community centre at Kudaloi village of Kudaloi GP. 
                 
17.23
           
16.54
47
Lakhanpur
Jharsuguda
Supply of drinking water by 8kl capacity water tanker to village Tingismal at LKP OCP
                   
6.48
              
0.89
48
Lakhanpur
Jharsuguda
Supply of drinking water by 8kl capacity water tanker to village Ubda at LKP OCP
                   
6.22
              
1.44
49
Lakhanpur
Jharsuguda
Supply of drinking water by 8kl capacity water tanker to village Karlajori and Khaliapali at LKP OCP
                   
7.39
              
1.77
50
Lakhanpur
Jharsuguda
Supply of drinking water by 8kl capacity water tanker to village Luharpada and Sahajbahal at LKP OCP
                   
6.62
              
1.58
51
Lakhanpur
Jharsuguda
Supply of drinking water to village Kherualbahal & Lechipada under CSR
                   
8.49
              
0.80
52
Lakhanpur
Jharsuguda
Supply of drinking water to village Darlipali under CSR
                   
5.59
              
0.49
53
Lakhanpur
Jharsuguda
Improvement of Dalgaon Kanta(Pond) & construction of bathing steps.
                 
10.27
              
9.84
54
Lakhanpur
Jharsuguda
Construction of Boundary wall of Kalyan Mandap and CC Road near Filter plant at Bandbahal Gram Panchayat
                 
13.22
           
12.90
55
Lakhanpur
Jharsuguda
Supply of drinking water to Darlipali village under BOCM (AP-1)
                   
5.03
              
4.80
56
Lakhanpur
Jharsuguda
Supply of drinking water to village Karlajori & Khaliapali at LKP OCP under LKPA (AP-2)
                   
6.11
              
4.67
57
Lakhanpur
Jharsuguda
Supply of drinking water to villages Sunari, Remanda, Tilia, Phatapali, Negipali, Badmal, Kansbahal, Senhamal, Cherketa (Phase-II) under BIT for 60 days (SP-2)
                 
10.74
              
9.12
58
Lakhanpur
Jharsuguda
Supply of drinking water to villages Jurabaga, Majhipada and Muchabahal under BOCM for 90 days (SP-8)
                   
4.18
              
4.18
59
Lakhanpur
Jharsuguda
Supply of drinking water to villages Baghamunda, Dasrupali, Dasrupali (Mundapada), Gopipali and Salepali under BOCM for 90 days (SP-7)
                   
7.05
              
7.01
60
Lakhanpur
Jharsuguda
Errection of new 11kv & 440 vt power supply for resettlement of sukbasi families affected village under CSR
                 
37.45
           
19.41
61
Lakhanpur
Jharsuguda
Supply of drinking water by water tanker at Belpahar N.A.C.(lead 8 Km) by 5 KL capacity water tanker at BIT.
                   
0.83
              
0.08
62
Lakhanpur
Jharsuguda
Supply of drinking water to villages Belpahar NAC, Lakhanpur Block, Jagdalpur (Phase – III) under BIT for 60 days (SP-3)
                   
5.91
              
4.76
63
Lakhanpur
Jharsuguda
Supply of drinking water to villages Gopipali, Talibahal, Limtalipada, Khaliamunda (Phase – IV) under BIT for 60 days (SP-4)
                   
6.52
              
5.68
64
Lakhanpur
Jharsuguda
Improvement of Snehmal Kanta (pond) and construction of bathing steps under Dalgaon G.P.
                 
10.41
           
10.23
65
Lakhanpur
Jharsuguda
Construction of boundary wall with gate at Manoj Padhee High School, Sarandamal village.
                 
15.24
           
15.23
66
Lakhanpur
Jharsuguda
Supply of drinking water to village old Khairkuni, new Khairkuni, Chuchapada,Jaybidia & Changapada in LKP OCP CSR
                   
5.46
              
5.02
67
Lakhanpur
Jharsuguda
Construction of Kalyan Mandap at Banjari in Banjari Gram Panchayat
                 
17.93
           
17.49
68
Lakhanpur
Jharsuguda
Construction of Kalyan Mandap at Bartap in Banjari Gram Panchayat
                 
17.64
           
17.59
69
Lakhanpur
Jharsuguda
Construction of Kalyan Mandap at Jaybudia in Banjari Gram Panchayat
                 
17.64
           
17.40
70
Lakhanpur
Jharsuguda
Supply of drinking water to villages Kudaloi, Chingriguda, Bichhuapada, Gangapada, Dahaldera, Bholamal, Thakthakipada and Bazarpada at LKP OCP under LKPA (SP-6)
                   
7.43
              
6.58
71
Lakhanpur
Jharsuguda
Supply of drinking water to villages Bejibandh, Piplikani, Satlang, Batlang , Vejikudh, Padapali, Old Vejikudh, Phata, Karpabahal, Dhubentipi, Baragada, Khapsimunda, Khamardihi, Khadam, Kirarama (Phase-I) under BIT for 60 days. (Summer Package-1)
                 
12.00
           
10.64
72
Lakhanpur
Jharsuguda
Construction of CC Road at Jamuna at Kushraloi Gram Panchayat
                   
7.01
              
6.91
73
Lakhanpur
Jharsuguda
Supply of drinking water by water tanker at Limtalia pada and Khaliamunda (lead 8 Km) by 5 KL capacity water tanke at BIT/LKPA.
                   
0.75
              
0.02
74
Lakhanpur
Jharsuguda
Supply of drinking water by water tanker at Gopipali (lead 15 Km) 
                   
0.62
              
0.06
75
Lakhanpur
Jharsuguda
Supply of drinking water by water tanker at Phata village (lead 4 Km) by 5 KL capacity water tanker at BIT.
                   
0.45
              
0.04
76
Lakhanpur
Jharsuguda
Supply of drinking water by water tanker at  Karpabahal, Dhubentipi, and Baragada (Lead 2-4 Km) by 05 KL capacity water tanker at BIT/LKPA.
                   
0.75
              
0.05
77
Lakhanpur
Jharsuguda
Supply of drinking water by water tanker at Negipali, Badimal, Kansbahal, Senhamal and Cherkata under Doalgoan Panchayat (lead 11 KM) by 12 KL Capacity water tanker at  BIT.
                   
0.97
              
0.01
78
Lakhanpur
Jharsuguda
Supply of drinking water by water tanker at Lakhanpur Block ( lead 15 Km) by 12 KL Capacity water tanker at BIT/LKPA.
                   
1.40
              
0.01
79
Lakhanpur
Jharsuguda
Supply of drinking water by water tanker at Sunari G.P. (lead 20 Km) by 12 KL Capacity water tanker at BIT.
                   
1.57
              
0.03
80
Lakhanpur
Jharsuguda
Construction of concrete road from Talipada to Goudapada connecting main road with drain system on both side of road.
                 
49.59
           
47.93
81
Lakhanpur
Jharsuguda
Completion of Drain at Shanti nagar at Bandhbahal Gram Panchayat
                 
11.71
           
11.71
82
Lakhanpur
Jharsuguda
P&M water supply arrangement for 29 nos toilets under Swachha Aabhijan under BOCM
                 
15.58
              
0.77
83
Lakhanpur
Jharsuguda
Supply of drinking water to villages Kherulbahal and Lechuapada under BOCM for 1 year (AP-1)
                   
7.87
              
6.52
84
Lakhanpur
Jharsuguda
Supply of health materials for COVID-19
                   
2.31
              
2.31
85
Lakhanpur
Jharsuguda
Supply of IR Thermometer for COVID-19
                   
0.14
              
0.14
86
Lakhanpur
Jharsuguda
Payment of honorarium to staff Nurse (Contractual) for COVID-19
                   
5.40
              
0.26
87
Lakhanpur
Jharsuguda
Payment of honorarium for the period 28.09.20 - 27.10.20 to contractual staff nurse
                   
5.40
              
0.29
88
Lakhanpur
Jharsuguda
Payment of honorarium for the period 28.10.2020 - 26.11.2020 to contractual staff nurse
                   
5.40
              
0.30
89
Lakhanpur
Jharsuguda
Supply of Refrigerator for COVID-19 hospital
                   
0.21
              
0.21
90
Lakhanpur
Jharsuguda
Supply of health materials for COVID-19
                   
0.11
              
0.11
91
Lakhanpur
Jharsuguda
Supply of health materials for COVID-19
                   
0.11
              
0.11
92
Lakhanpur
Jharsuguda
Supply of Mask during COVID-19
                   
0.12
              
0.12
93
Lakhanpur
Jharsuguda
Payment of honorarium to staff Nurse (Contractual) for COVID-19
                   
5.40
              
0.26
94
Lakhanpur
Jharsuguda
Payment Honorarium to Staff Nurse (Contractual) for COVID-19
                   
5.40
              
0.26
95
Lakhanpur
Jharsuguda
Payment of honorarium for the period 28.09.20 - 27.10.20 to contractual staff nurse
                   
5.40
              
0.30
96
Lakhanpur
Jharsuguda
Payment of honorarium for the period 28.10.2020 - 26.11.2020 to contractual staff nurse
                   
5.40
              
0.28
97
Lakhanpur
Jharsuguda
Supply of Dead body bag for COVID-19
                   
0.15
              
0.15
98
Lakhanpur
Jharsuguda
Supply of material for covid care centre
                   
0.23
              
0.23
99
Lakhanpur
Jharsuguda
Procurement of cleaning material for COVID-19 at Hospital
                   
2.33
              
2.33
100
Lakhanpur
Jharsuguda
Supply of health materials for COVID-19
                   
1.13
              
1.13
101
Lakhanpur
Jharsuguda
Supply of health materials for COVID-19
                   
3.67
              
3.67
102
Lakhanpur
Jharsuguda
Supply of water cooler cum purifier for Lakhanpur Area under CSR
                   
1.73
              
1.73
103
Lakhanpur
Jharsuguda
Payment of honorarium to Staff Nurse(Contractual) for COVID-19
                   
5.40
              
0.13
104
Lakhanpur
Jharsuguda
Payment of honorarium for the period 28.09.20 - 27.10.20
                   
5.40
              
0.30
105
Lakhanpur
Jharsuguda
Payment of honorarium for the period 28.10.2020 - 26.11.2020
                   
5.40
              
0.30
106
Lakhanpur
Jharsuguda
Purchase of health materials for Police Personnel deployed for COVID-19
                   
0.17
              
0.17
107
Lakhanpur
Jharsuguda
Procurement of health materials for COVID-19 under CSR
                   
4.31
              
4.07
108
Lakhanpur
Jharsuguda
Procurement of health materials for COVD-19 under CSR
                 
18.31
           
18.31
109
Lakhanpur
Jharsuguda
Procurement of health materials for COVID-19 under CSR
                   
0.74
              
0.74
110
Lakhanpur
Jharsuguda
Procurement of health materials for COVID-19 under CSR
                   
2.99
              
2.25
111
Lakhanpur
Jharsuguda
Supply of cotton mask during COVID-19 at LKPA under CSR
                   
2.52
              
2.52
112
Lakhanpur
Jharsuguda
Supply of furniture for COVID-19 hospital
                   
1.08
              
1.08
113
Lakhanpur
Jharsuguda
Payment of Honorarium to Staff Nurse engaged in Covid care Centre
                   
5.40
              
0.26
114
Lakhanpur
Jharsuguda
Procurement of N-95 Mask
                   
0.89
              
0.89
115
Lakhanpur
Jharsuguda
Supply of health materials for COVID-19
                   
4.16
              
4.16
116
Lakhanpur
Jharsuguda
Supply of health material FOR covid-19
                   
3.82
              
3.82
117
Lakhanpur
Jharsuguda
Supply of health materials for COVID-19
                   
2.47
              
2.47
118
Lakhanpur
Jharsuguda
Purchase of health material for COVID-19
                   
0.05
              
0.05
119
Lakhanpur
Jharsuguda
Payment towards refilling of oxygen cylinder for COVID Health Care Centre
                   
0.06
              
0.06
120
Lakhanpur
Jharsuguda
Supply of health material for distribution to senior citizen under CSR
                   
1.20
              
1.20
121
Lakhanpur
Jharsuguda
Purchase of health material for COVID-19
                   
0.07
              
0.07
122
Lakhanpur
Jharsuguda
Supply of IV stand SS for COVID-19 Health Centre
                   
0.54
              
0.54
123
Lakhanpur
Jharsuguda
Purchase of health materials for COVID-19
                   
2.09
              
2.09
124
Lakhanpur
Jharsuguda
Supply of Face shield for COVID-19
                   
0.11
              
0.11
125
Basundhara
Sundargarh
Supply of street light (20Nos.) at Keusira village
                   
2.51
              
2.51
126
Basundhara
Sundargarh
Supplying of drinking water to Tikilipara and Sardega R&R village through tanker for the year 2020 under CSR scheme of BG area
                   
1.78
              
1.77
127
Basundhara
Sundargarh
Supplying of drinking water to Khamarpara village  through tanker for the year 2020 under CSR scheme of BG area  
                   
1.05
              
1.04
128
Basundhara
Sundargarh
Supplying of drinking water Gopalpur village  through tanker for the year 2020 under CSR scheme of BG area
                   
1.70
              
1.69
129
Basundhara
Sundargarh
Supplying of drinking water to Kulda and Chaitalgadi/Bankibahal villages  through tanker for the year 2020 under CSR scheme of BG area 
                   
1.51
              
1.51
130
Basundhara
Sundargarh
Supplying of drinking water to Siarmal village  through tanker for the year 2020 under CSR scheme of BG area
                   
1.37
              
1.36
131
Basundhara
Sundargarh
Supplying of drinking water to Tumulia village  through tanker for the year 2020 under CSR scheme of BG area
                   
2.75
              
2.74
132
Basundhara
Sundargarh
Supplying of drinking water to Garjanbahal village  through tanker for the year 2020 under CSR scheme of BG area
                   
1.63
              
1.63
133
Basundhara
Sundargarh
Supplying of drinking water to Bangurkela and Karlikachar village through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.97
              
1.95
134
Basundhara
Sundargarh
Supplying of drinking water to Barpali village and R&R site through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.16
              
1.15
135
Basundhara
Sundargarh
Supplying of drinking water to Kuisira village through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.35
              
1.34
136
Basundhara
Sundargarh
Supplying of drinking water to Balinga (Barpali road side) village through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.07
              
1.06
137
Basundhara
Sundargarh
Supplying of drinking water to Duduka village through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.52
              
1.51
138
Basundhara
Sundargarh
Supplying of drinking water to Kaletpani village through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.00
              
0.99
139
Basundhara
Sundargarh
Supplying of drinking water to Sarangijharia village through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.37
              
1.36
140
Basundhara
Sundargarh
Supplying of drinking water to Sumura village through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.47
              
1.46
141
Basundhara
Sundargarh
Supplying of drinking water to Ganjebud village through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.15
              
1.14
142
Basundhara
Sundargarh
Supplying of drinking water to Tiuria village through tanker for the year 2020 under CSR Scheme of Basundhara Area.
                   
1.46
              
1.45
143
Basundhara
Sundargarh
Providing street light at Ratanpur (Meherpada) village.
                   
3.36
              
3.36
144
Basundhara
Sundargarh
Construction of community centre Ratanpur (Meherpada) village.
                   
9.67
              
8.24
145
Basundhara
Sundargarh
Provision for drinking water, const. Of drainage and colouring of school building of Barplai R&R UP school
                   
7.13
              
7.13
146
Basundhara
Sundargarh
Providing solar street light (30 nos), at Ratansara village
                   
4.10
              
4.10
147
Basundhara
Sundargarh
Renovation of pond at Ratansara village
                   
4.03
              
4.03
148
Basundhara
Sundargarh
Repairing of Mandap at Tikilipara R&R village
                   
3.23
              
3.23
149
Basundhara
Sundargarh
Repair of existing bathing ghats and construction of new bathing ghats (2 nos.) at Khamarpara
                   
8.15
              
8.15
150
Basundhara
Sundargarh
Repair and maintenance of Garjanbahal Primary School under CSR Scheme of Basundhara
                   
3.51
              
3.49
151
Basundhara
Sundargarh
Repair and maintenance of Ratanpur High School and Primary School
                 
16.92
           
16.92
152
Basundhara
Sundargarh
Repair and maintenance of Ratansara primary School
                   
1.75
              
1.75
153
Basundhara
Sundargarh
Repair and maintenance of Gopalpur primary School
                   
2.07
              
2.07
154
Basundhara
Sundargarh
Repair and maintenance of Telendihi primary School
                   
2.54
              
2.54
155
Basundhara
Sundargarh
Repair and maintenance of Haldibahal primary School
                   
4.57
              
4.48
156
Basundhara
Sundargarh
Repair and maintenance of Tumulia High School
                 
12.80
           
12.80
157
Basundhara
Sundargarh
Construction of 50 seated hostel at Basundhara High School, Tikilipara under CSR of Basundhara Area
                 
66.18
           
12.41
158
Basundhara
Sundargarh
Repair and maintenance of Siarmal Primary School 
                   
2.84
              
2.84
159
Basundhara
Sundargarh
Providing health care facilities for providing shelter homes to the migrant labours under CSR Scheme of Basundhara Area. 
                   
3.49
              
3.49
160
Basundhara
Sundargarh
Procurement of 10000 Surgical Mask for taking preventive measure of corona virus under CSR Scheme of Basundhara Area
                   
2.99
              
2.99
161
Basundhara
Sundargarh
Providing food materials to 300 rural households affected by Covid lockdown in Hemgir Block under CSR Scheme of Basundhara Area
                   
1.39
              
1.39
162
Basundhara
Sundargarh
Providing food materials to 268 rural households affected by Covid lockdown in Hemgir Block under CSR Scheme of Basundhara Area
                   
1.24
              
1.24
163
Basundhara
Sundargarh
Improvement of Kuarkela Playground under CSR scheme of Basundhara Area
                 
10.07
              
3.69
164
Basundhara
Sundargarh
Construction of toilet in newly constructed saraswati sishu mandir school tikilipara under CSR Scheme of Basundhara Area
                   
9.92
              
2.00
165
Basundhara
Sundargarh
Observance of swachhata Hi seva 2020
                   
1.20
              
0.69
166
Basundhara
Sundargarh
Distribution of Blankets to the poor and needy people living in the periphery of Basundhara Area
                   
1.99
              
1.98
167
Basundhara
Sundargarh
Washing and painting of community centre at Durubaga village under CSR scheme of Basundhara Area
                   
1.62
              
1.62
168
Basundhara
Sundargarh
Urban tree plantation at Sundargarh
              
248.46
           
50.11
169
Basundhara
Sundargarh
Construction of community center at Belsara village 
                   
8.25
              
0.85
170
Talcher
Angul
Supply of water to village Gurujang in Talcher Sub-division for the year 2020 for Talcher Area (Package V) 120 days.
                 
14.70
           
14.40
171
Talcher
Angul
Supply of   water to villages Arakhapal, Kanteikolia, Gopaballavpur and Rangamatia in Talcher Subdivision for the year 2020 for Talcher Area (Package VII) 120 days.
                   
9.74
              
9.74
172
Talcher
Angul
Supply of water to village Sirigida in Talcher Sub-division for the year 2020 for Talcher Area (Package VI) 120 days
                   
6.87
              
6.87
173
Talcher
Angul
Supply of water to village Luhundi, Godibandha chhak tanki and Belapada in Talcher sub-division for the year 2020 for Talcher Area
                   
6.43
              
6.38
174
Talcher
Angul
Supply of water to Radharamanpur and Brajanathpur in Talcher Sub-Division for the year 2020 for Talcher Area
                   
8.74
              
8.74
175
Talcher
Angul
Supply of Water to Villages Raghunathpur and Biraramachandrapur in Talcher Sub-Division for the year 2020 for Talcher Area (Package -II) (120 days).
                   
8.75
              
8.75
176
Talcher
Angul
Supply of water to villages Raghunathpur & Biraramchandrapur in for the year 2021 for Talcher Area
                   
6.94
              
1.68
177
Talcher
Angul
Supply of water to villages Brajanathpur & Radharanpur for the year 2021 for Talcher Area
                   
7.17
              
1.73
178
Talcher
Angul
Supply of water to villages Luhundi, Godibandha chhak and Belpada for the year 2021 for Talcher Area
                   
5.10
              
0.55
179
Talcher
Angul
Supply of water to village Gurujang for the year 2021 
                   
9.58
              
1.04
180
Talcher
Angul
Supply of water to village Sirigida for the year 2021
                   
5.52
              
0.60
181
Talcher
Angul
Widening of existing Kishoripal village road for a length 720.00 mtr. From Arjunakata junction under CSR activities of Talcher Area.
                 
18.57
              
1.00
182
Talcher
Angul
Distribution of Blanket  and other daily utilities to economic poor section people
                   
0.80
              
0.80
183
Talcher
Angul
Distribution of sanitary pads
                   
0.06
              
0.06
184
Talcher
Angul
Grant in aid for LWUP School, Dera
                   
3.70
              
3.70
185
Talcher
Angul
Grant in aid for LWUP School, Nandira
                   
3.02
              
3.02
186
CWS Talcher
Angul
Educational and Vocational training of Apprentice
                 
28.54
           
28.54
187
Hingula
Angul
Supply of water during summer season 2021 to village Sanjorada, Karnpur & Natidi(package 2)
                   
8.33
              
0.97
188
Hingula
Angul
Supply of water during summer season 2021 to village Badajorada(package 1)
                   
7.08
              
0.83
189
Hingula
Angul
Swachta hi seva/ Swachhta Month 2020
                   
1.20
              
0.57
190
Hingula
Angul
Supply of water during summer season 2020 to village Badajorada(package 1)
                   
9.25
              
6.29
191
Hingula
Angul
Supply of water during summer season 2020 to village Sanjorada, Karnpur & Natidi(package 2)
                 
14.11
           
10.11
192
Hingula
Angul
Expenditure Towards Welfare Activities by Pratibha Mahila Mandal hingula Area
                   
2.00
              
1.00
193
Hingula
Angul
Construction of Boundary wall at Sakosingha High School, Sakosingha Village under CSR works of Hingula Area for the year 2019-20
                   
6.95
              
6.95
194
Hingula
Angul
Construction of Pucca Drain from Balram STP to Nandira Jor through Kannapur Village
                   
7.21
              
7.21
195
Hingula
Angul
Improvement of Road from Balramprasad to Laxman Prasad( 4km)
                 
40.00
           
40.00
196
Hingula
Angul
Arrangement regarding Mashal Sobha Yatra in connection with Zilla Mohatsav Angul-2020
                   
0.78
              
0.78
197
Hingula
Angul
Procurement of 200 kg of alum for Hingula Area
                   
0.24
              
0.24
198
Hingula
Angul
Supply of water during summer season 2020    to
village  Mallibandha, Nuamuhin,
Antagadia and Jambudhara  under Hingula Area ". (Package-13)
                   
9.00
              
9.00
199
Hingula
Angul
Supply of water during summer season 2020   to
village New Gopalprasad,New Antagadia,Kainthanali
and Kusumpal under Hingula Area".(Package-12)
                 
10.35
           
10.35
200
Hingula
Angul
Supply of water during summer season 2020   to
village Bhalugadia under Hingula Area". (Package-11)
                   
4.98
              
4.98
201
Hingula
Angul
Construction of community center of
Nisha village under CSR
works of Hingula Area.
                   
6.08
              
4.97
202
Hingula
Angul
Construction of community center of
Nisha Bazar Chok of Nisha
Village under CSR works of Hingula Area.
                   
7.93
              
5.70
203
Hingula
Angul
Supply of water to village Telipur,
Telipur Harijansahi,Teipur
Sikhapalsahi and Khuringa under Hingula Area.(Pack-03)
                   
6.98
              
6.70
204
Hingula
Angul
Supply of water to village Solada under Hingula Area (Pack-18)
                 
19.70
           
19.70
205
Hingula
Angul
Supply of water during summer season 2020 to village
Chittlpur Kumunda Nakeipasi,
Hadisahi, Kumunda Hadisahi,
Mardahariharpur and Ambaburi under Hingula Area.(Pack-16)
                 
11.84
           
11.84
206
Hingula
Angul
Supply of water during summer season 2020  
  to village Banabaspur and Baghabaspur
under Hingula Area (Package-15)
                 
10.02
           
10.02
207
Hingula
Angul
Supply of water during summer season 2020 to
village Gopal prasad, Gopal prasad
Khalisahi(School Sahi),Khamar & Patnasahi under HA.(Package No.14) .
                 
15.03
           
15.03
208
Hingula
Angul
Supply of water during summer season 2020  to
village  Kankarei, Chhotoberini and
Pidhakhaman under  Hingula Area."  ( Package-25) 
                 
11.13
           
11.13
209
Hingula
Angul
Supply of water for domestic purpose of designated
place of villages near HOCP and BOCP
under HA for a period of one year .(Except summer season)2020-21
                 
16.53
           
11.13
210
Hingula
Angul
Supply of water during summer season 2020 to village Majhika,
Birabarpur, Solada Deulsahi, Nathagaon Police
out post Kalamachhuin, PHC Kalamachhuin including
Hingula High School, Golkula family, Thnla sahi Bania sahi Bidyadhar and
Anatryami under Hingula Area.(pack-04)
                 
15.57
           
15.57
211
Hingula
Angul
Supply of water during summer season 2020  to
village  Kalamchhuin(Including
Hadisahi, Harijansahi, Kalikaprasad and Kalamchhuin
Baunsagadia under Hingula Area ". (Package-20)
                 
15.21
           
15.21
212
Hingula
Angul
Supply of water during summer season 2020  to
village Kumunda, Kumunda Tanlasahi,
Kumunda Nua Tanlasahi,Kumunda Tentulisahi
and Purunapani under Hingula Area.(Pack-17)
                 
21.76
           
21.76
213
Hingula
Angul
Erecting 6.6KV overhead power supply
line from 33KV substation
of HOCP to Hingula Mandir.
                   
7.58
              
7.58
214
Hingula
Angul
Construction of 4 nos class room at High School campus of Nisha Village
                 
19.57
           
19.57
215
Hingula
Angul
Supply of water during summer season 2021 
to village Telipur,Telipur
Harijansahi,Teipur Sikhapalsahi and
Khuringa under Hingula Area.(Pack-03)
                   
6.26
              
1.74
216
Hingula
Angul
Supply of water during summer season 2021to village Majhika,
Birabarpur, Solada Deulsahi, Nathagaon Police out post Kalamachhuin, PHC
Kalamachhuin including Hingula High School, Golkula family,
Thnla sahi Bania sahi Bidyadhar and Anatryami
under Hingula Area.(pack-04)
                 
13.33
              
3.70
217
Hingula
Angul
Supply of water during summer season 2021
to village Gopal prasad, Gopal prasad Khalisahi(School Sahi),
Khamar & Patnasahi under HA.(Package No.14) .
                 
13.43
              
2.84
218
Hingula
Angul
Supply of water during summer season 2021 to
village Chittlpur Kumunda Nakeipasi,
Hadisahi, Kumunda Hadisahi, Mardahariharpur and Ambaburi
under Hingula Area.(Pack-16)
                 
10.96
              
2.31
219
Hingula
Angul
Supply of water during summer season
2021to Village Soloda under
Hingula Area.(Pack-18)
                 
14.22
              
3.95
220
Hingula
Angul
Supply of water during summer season
2021 to village Bhalugadia
under Hingula Area.(Pack-11)
                   
2.91
              
0.45
221
Hingula
Angul
Supply of water during summer season 2021  to village Kumunda,
Kumunda Tanlasahi,Kumunda Nua Tanlasahi,Kumunda Tentulisahi
and Purunapani under Hingula Area.(Pack-17)
                 
13.38
              
3.42
222
Hingula
Angul
Supply of water during summer season 2021  to
village New Gopalprasad,New Antagadia,Kainthanali and Kusumpal under Hingula
Area".(Package-12)
                   
5.90
              
1.44
223
Hingula
Angul
Supply of water during summer season 2021    to
village  Mallibandha, Nuamuhin, Antagadia and Jambudhara  under Hingula
Area ". (Package-13)
                   
7.36
              
1.23
224
Hingula
Angul
Supply of water during summer season 2021    to
village Banabaspur and Baghabaspur under Hingula Area (Package-15)
                   
9.71
              
0.65
225
Hingula
Angul
Supply of water during summer season 2021 to village 
Kankarei, Chhotoberini and Pidhakhaman under  Hingula Area." 
( Package-25) 
                   
7.21
              
1.50
226
Hingula
Angul
Deepening of pond of village Banabaspur under CSR of Hingula OCP 
                   
8.62
              
8.62
227
Hingula
Angul
Supply of water during summer season 2021  to
village  Kalamachhuin(Including
Hadisahi, Harijansahi, Kalikaprasad and
Kalamchhuin Baunsagadia under Hingula Area ". (Package-20)
                 
12.23
              
3.40
228
Hingula
Angul
Supply of water for domestic purpose of designated place of
villages near Hingula OCP and Balaram
OCP for one year. /(except summer season) under CSR of Hingula Area.
                 
16.53
              
1.08
229
Hingula
Angul
Supply of water to village Kandhabareni, Baleswarsahi etc
                   
7.30
              
7.30
230
Hingula
Angul
Supply of water to village Barapali
                   
3.89
              
3.89
231
Hingula
Angul
Supply of water to village Bahalsahi
                   
5.78
              
3.55
232
Hingula
Angul
Supply of water to village Danara Gandhi Sagar and Danara Adiwasi Sahi 
                   
3.71
              
3.71
233
Hingula
Angul
Supply of water to village Tileipasi and Khajuria
                   
7.14
              
7.14
234
Hingula
Angul
Supply of  water to village Joragadia, Tangara Sahi, Hadisahi under Hingula Area
                   
6.29
              
6.29
235
Hingula
Angul
Repairing of damaged house of Kalamchuin village due to blasting operation
                 
19.84
              
6.45
236
Hingula
Angul
Supply of water to village Nakeipasi under ha
                 
10.09
              
9.79
237
Hingula
Angul
Supply of water to village Ambal, Badamahitaila and Sana Mahitaila under ha
                   
9.66
              
2.17
238
Hingula
Angul
Supply of water to village Natada, Badajharna and Bethianadi 
                 
12.16
              
5.23
239
Hingula
Angul
Supply of water to village Kalamchuin, Purunasahi, Nuasahi, Nuamunda sahi under HA
                   
9.07
              
9.07
240
Hingula
Angul
Supply of water to domestic purpose at designated places of Majhika village under BOCP
                   
8.34
              
6.97
241
Hingula
Angul
Supply of water to kusharansahi of jamunali village under HA
                   
4.96
              
4.59
242
Hingula
Angul
Construction of pucca drain in near entering entrance road at Jambubahali village
                   
7.94
              
7.67
243
Hingula
Angul
Construction of RCC drain from Danara Mandapa sahi old pump house of BOCP,HA
                   
7.84
              
7.76
244
Hingula
Angul
Construction of RCC drain at Katasahi of Danara village of BOCP,HA
                   
7.83
              
7.79
245
Hingula
Angul
Deepening of nuabandha pond near Hingula area R&R site of Jamunali village
                 
13.22
           
12.91
246
Hingula
Angul
Construction of drain along both side road of jamunali village
                   
7.19
              
7.14
247
Hingula
Angul
Construction of Rahasabadi at jamunali ektali sahi under BOCP
                   
9.48
              
9.48
248
Hingula
Angul
Construction of bathing step and changing room in village pond khaliamunda of jamunali under Hingula Area
                   
4.93
              
1.11
249
Hingula
Angul
Providing and fixing of dustbin in village of Jamunali under Hingula Area
                   
1.42
              
1.42
250
Hingula
Angul
Construction of RCC water storage tank in front of Hingula college near BOCP
                   
1.00
              
1.00
251
Hingula
Angul
Construction of Rahasbadi at Gotha Sahi in front of Kalimandir, Jamunali under CSR
                 
12.32
           
10.46
252
Hingula
Angul
Construction of boundary wall of Ambapal high school, Natada GP under CSR
                   
6.37
              
6.26
253
Hingula
Angul
Construction of concrete road from Binod Sagar to Danara mini stadium at Danara village under CSR
                   
6.90
              
3.35
254
Hingula
Angul
Constn of kalyan mandap at Danara village under CSR
              
117.90
           
73.30
255
Hingula
Angul
Supply of Water during summer Season to village Kandhabhereni and Baleswara sahi
                   
4.70
              
0.86
256
Hingula
Angul
Supply of Water during Summer Season 2021-22 village Joragadia Tangrasahi, Hadisahi and sarang
                   
4.26
              
0.50
257
Hingula
Angul
Supply of Water during Summer Season 2021-22 village Danara Gandhi Sagar and Danar Adiwasi Sahi
                   
2.93
              
0.41
258
Hingula
Angul
Supply of Water During summer Season to village Ambapal, Badamahitala and Sanamahitala
                   
5.37
              
0.98
259
Hingula
Angul
Supply of Water During summer Season to village Bahalasahi
                   
3.35
              
0.61
260
Hingula
Angul
Supply of Water During summer Season to village Nakeipasi
                   
4.26
              
0.62
261
Hingula
Angul
Supply of Water During summer Season to Village Kalamchuin Purunasahi, Nayaksahi, ektali etc
                   
6.01
              
1.40
262
Hingula
Angul
Supply of Water During summer Season to Village Satyabadisagarsahi, solada
                   
1.09
              
0.93
263
Hingula
Angul
Supply of Water During summer Season to Village Barpali
                   
3.11
              
0.36
264
Bharatpur 
Angul
Supply of water for domestic purpose through water tanker to village  Ekdal, (Sanjamunda Sahi, Road Nayak Sahi,  Puruna Sahi, Baragharia Sahi) & Hiloi ,  under Bharatpur Area for the year 2018
                 
14.20
              
1.58
265
Bharatpur 
Angul
Supply of water for domestic purpose  through water tanker to village Nuasahi , Bahal ,Padmabatipur and   Lachhamanpur  under Bharatpur Area for the year 2019
                   
7.76
              
5.39
266
Bharatpur 
Angul
Supply of water for domestic purpose  through water tanker to village  Badasinghada and Sanasinghada under Bharatpur Area for the year 2019
                   
6.19
              
4.63
267
Bharatpur 
Angul
Supply water for domestic purpose through water tanker to village Jambubahali under Bharatpur area for the year 2020.
                   
7.20
              
5.40
268
Bharatpur 
Angul
Supply of water for domestic purpose  through water tanker to village Chhendipada Bentakuri Sahi,Tanla Sahi,Kumbhra Sahi,Gochhayat Sahi,Harizan Sahi,  Kaith Sahi,Behera Sahi,Bhamara Sahi and Pradhan Sahi under BA for 4 months (March to June 2020).
                 
12.35
              
9.06
269
Bharatpur 
Angul
Supply water for domestic purpose through water tanker to VILLAGE Chhendipada (ward no.10)Mamurai sahi and Bhahal Sahi  under Bharatpur area for the year 2020.
                 
12.73
           
11.12
270
Bharatpur 
Angul
Supply water for domestic purpose through water tanker to village Kutaripasi and Brundabanpur under Bharatpur area for the year 2020.
                 
10.57
           
10.11
271
Bharatpur 
Angul
Supply of water for domestic purpose to village   to village Jambubahali  under Bharatpur Area" for the year 2021.
                   
5.01
              
1.66
272
Bharatpur 
Angul
Supply of water for domestic purpose to village   to village Nua sahi, Padmabatipur & Lachhmanpur  under Bharatpur Area" for the year 2021.
                   
5.88
              
2.17
273
Bharatpur 
Angul
Supply of water for domestic purpose to village   to village Badasinghada &Sanasinghada  under Bharatpur Area" for the year 2021.
                   
4.84
              
1.21
274
Bharatpur 
Angul
Supply of water for domestic purpose to village   to village Rakas , Kutaripasi & Brundabanpur  under Bharatpur Area" for the year 2021.
                   
6.22
              
1.55
275
Bharatpur 
Angul
Supply of water for domestic purpose to village   to village Kuio & Kuio rehabilitation colony  under Bharatpur Area" for the year 2021.
                   
8.45
              
0.69
276
Bharatpur 
Angul
Supply of water for domestic purpose to village   to village Chhendipada (Ward 10, Mamuria Sahi & Bahal Sahi)  under Bharatpur Area" for the year 2021.
                   
8.52
              
0.56
277
Bharatpur 
Angul
Supply water for domestic purpose through water tanker to village Kuio and Kuio Rehabilitation colony and Kuio Harizan sahi under Bharatpur area for the year 2020.
                 
13.54
              
8.68
278
Bharatpur 
Angul
Construction of drain between temple and pond at Karnapur
                 
19.95
           
17.72
279
Bharatpur 
Angul
Supply of water for domestic purpose to village   to village Chhendipada (Bentakuri sahi,Tanala sahi, Kumbhara Sahi, Bhamara Sahi, Gochhayat sahi)  under Bharatpur Area" for the year 2021.
                   
8.96
              
0.59
280
Bharatpur 
Angul
Upgrading , Sanitary Facility, Drinking Water and Waiting Room at Chhendipada Tahasil Office under Bharatpur Area (RDC Work).
                 
22.90
           
11.17
281
Bharatpur 
Angul
Operation of Pump at Chhendipada OCP for  water supply in Summer
                   
1.32
              
1.00
282
Bharatpur 
Angul
Cleaning of drain & grass cutting at Baulpur R & R colony
                   
1.94
              
1.94
283
Bharatpur 
Angul
Daily operation of pump valve daily operation of pumps,valves and motor at R & R colony Boulpur under Bharatpur Area
                   
8.29
              
1.36
284
Bharatpur 
Angul
Daily operation of Pump valve and Guarding water supply for R& R site BA.
                   
6.39
              
6.39
285
Bharatpur 
Angul
Providing banner, placard & other work at different location for swachhata (SHS)Campaign
                   
0.85
              
0.85
286
Jagannath
Angul
Strengthening of bituminous road including both sides cement concrete drain from Gurudwara to FCI gate as a CSR initiative of MCL under Jagannath Area
              
259.10
         
218.20
287
Jagannath
Angul
Drinking water arrangements  for Covid hospital at NSCH
                   
0.37
              
0.37
288
Jagannath
Angul
Arrangement of vehicles for  COVID-19 Hospital at NSCH
                   
0.56
              
0.56
289
Jagannath
Angul
Supply of essential items for COVID-19 patients
                 
27.38
           
27.38
290
Jagannath
Angul
Organizing workshop for Girl Child & 31st virtual National meet of Wips & AIDS Awareness Program
                   
0.75
              
0.75
291
Jagannath
Angul
Expenditure related to bed sheets, towels, sanitizing etc for COVID-19 Hospital at NSCH
              
156.04
         
156.04
292
Jagannath
Angul
Installation of Overhead tank with pipeline around Narayan Sewashram under CSR
                   
9.68
              
0.00
293
Jagannath
Angul
Supply of 5000 (Five thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme
                   
1.90
              
1.90
294
Jagannath
Angul
Operation of new sub-station/DG set of COVID-19 Hospital at NSCH
                   
1.85
              
1.85
295
Jagannath
Angul
Temporary supply of water through mobile water to the villages Diajharana, Tentulei, Bhanja colony and Gurudwar Adivasi Sahi under Jagannath Area for the year 2017 (PKG-6)
                 
10.63
              
0.00
296
Jagannath
Angul
Temporary supply of water through mobile water to the villages Rodashar, Chalagarh, Baghmara sahi, Baghamara Nua Sahi, Station Basti, Ghantapada Harijan Sahi Ward No. 1 & 4 under Jagannath Area for the year 2017 (PKG-3)
                 
11.82
              
0.00
297
Jagannath
Angul
Construction of balance CC road from FCI main road to railway station under CSR programme of Jagannath Area
                   
3.18
              
0.15
298
Jagannath
Angul
Temporary supply of water through water tanker to the villages Hariharpur (Kaniha Block), Pabitrapur, Dumuduma, Sadashivpur, Godibandha hospital and Pabitrapur (New Balanda) under Jagannath Area for the year 2020
                 
22.32
           
22.32
299
Jagannath
Angul
Sinking of 01 no. Deep bore well with submersible pump at Narayan Sevashram, Kukudang under CSR Programme of JA
                   
6.83
              
6.83
300
Jagannath
Angul
Repairing of existing steps and providing new steps at bathing Ghats in deulbandha pond of Ghantapada Village
                   
5.96
              
0.00
301
Jagannath
Angul
Power supply and connection to various instrument of Gas plant at COVID-19  hospital at NSCH
                   
3.43
              
3.43
302
Jagannath
Angul
Operation of new sub-station/DG set installed at MIMSR periphery for electrification of PG Hostel 
                   
2.02
              
2.02
303
Jagannath
Angul
Expenditure for New medical college (MIMSR) at NSCH
                 
20.70
           
20.70
304
Jagannath
Angul
Supply of 10000 (Ten thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme of Jagannath Area
                   
3.80
              
3.80
305
Jagannath
Angul
Project Supervision of Construction of Road over Bridge (ROB) at the level crossing near Ghantapada village under CSR programme of MCL Jagannath Area
              
223.68
           
52.13
306
Jagannath
Angul
Supply of medicine for relief health camp by NSCH
                   
0.59
              
0.59
307
Jagannath
Angul
Engagement of 01 (one) no. of Truck bearing registration no. OD355798 for mounting of Fog Cannon Mist Blower and DG set for 24 hours duty (with 2 drivers & 2 helper) for sanitization purpose of Talcher Coalfields under the control of Jagannath Area
                   
8.40
              
8.40
308
Jagannath
Angul
Engagement of 25 (Twenty-five) nos. of Bolero or equivalent vehicles for 24 hours duty during lockdown to contain the spread of COVID-19 in Angul
                 
32.40
           
32.40
309
Jagannath
Angul
Supply of 5000 (Five thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme
                   
0.95
              
0.95
310
Jagannath
Angul
Supply of 5000 (Five thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme
                   
0.95
              
0.95
311
Jagannath
Angul
Supply of 10000 (Ten thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme of Jagannath Area
                   
1.90
              
1.90
312
Jagannath
Angul
Deposit works of Urban Plantation & Nursery Raising in and around Angul
              
157.90
           
25.43
313
Jagannath
Angul
Supply of 20000 (Twenty thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme of Jagannath Area
                   
3.80
              
3.80
314
Jagannath
Angul
Supply of 20000 (Twenty thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme
                   
3.95
              
3.95
315
Jagannath
Angul
Supply of 10000 (Ten thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme of Jagannath Area
                   
1.90
              
1.90
316
Jagannath
Angul
Hiring of DG set including operation for running of Fog cannon towards sanitization of in and around area of Talcher Coalfields
                   
2.66
              
2.66
317
Jagannath
Angul
Supply of 10000 (Ten thousand five hundred) nos. of Hand sanitizer (alcohol based 500 ml) for distribution among villagers of peripheral villages as preventive measures against COVID-19 under CSR Programme of Jagannath Area
                 
27.68
           
27.68
318
Jagannath
Angul
Supply of saree, dhoti etc by Ananya Mahila Mandal under CSR Programme of JA.
                   
1.85
              
1.85
319
Jagannath
Angul
Construction of Road over bridge (ROB) at the level crossing near Ghantapada village before NTPC conveyor on the road from Handidhua chowk to NALCO chowk in Talcher Coalfields under CSR programme of MCL Jagannath Area
           
3,721.55
           
51.42
320
Jagannath
Angul
Development of WBM road from Naraharipur R&R site to MCL diversion road of BBSRI OCP,JA
                 
31.75
              
0.04
321
Jagannath
Angul
Making display board of repairing of existing old works of CSR works under Jagannath Area
                   
2.59
              
0.31
322
Jagannath
Angul
Renovation of BT road from Dera to Kandhabereni under CSR Programme of Jagannath Area
                 
94.93
              
7.91
323
Jagannath
Angul
Construction of cultural pendal shed at Ghantapada High School under CSR programme of Jagannath Area
                   
5.64
              
0.22
324
Jagannath
Angul
Construction of 01 No Deep Bore well and pipeline of village Baleswar under CSR Scheme 
                   
7.61
              
0.22
325
Jagannath
Angul
Construction of 01 No Deep Bore well and pipeline etc at Behera sahi of Hilloi village under CSR Scheme 
                   
5.67
              
0.17
326
Jagannath
Angul
Supply of N -95 Mask to COVID-19 hospital at NSCH
                   
2.92
              
2.92
327
Jagannath
Angul
Supply of Digital Thermometer & Pulse Oximeter to COVID-19 hospital at NSCH
                   
0.42
              
0.42
328
Jagannath
Angul
Up-Keeping of Residential houses for Personnel engaged for COVID-19 purpose  at newly constructed Medical College by NBCC (For 45 days)
                   
1.68
              
1.68
329
Jagannath
Angul
Temporary supply of water through water tanker to the villages Chatei Hutting, South Balanda, Bagadhar Mundasahi and Khandualbahal under Jagannath Area for the year 2020
                 
16.67
           
16.64
330
Jagannath
Angul
Temporary supply of water through water tanker to the villages Hariharpur (Kaniha Block), Dumuduma, Sadashivpur and Godibandha hospital under Jagannath Area for the year 2017 (PKG-4)
                   
6.12
              
0.00
331
Jagannath
Angul
Temporary supply of water through water tanker to the villages Hariharpur (Kaniha Block), Dumuduma, Sadashivpur and Godibandha hospital under Jagannath Area for the year 2018 (PKG-4)
                   
8.72
              
0.12
332
Jagannath
Angul
Temporary supply of water through water tanker to the villages Hariharpur (Kaniha Block), Pabitrapur, Dumuduma, Sadashivpur and Godibandha hospital under Jagannath Area for the year 2019
                 
15.69
              
0.00
333
Jagannath
Angul
Annual Drinking Water Supply through tanker for Naik Sahi, Hensmul High School, hensmul Rehabilitation site, Dera Harizan Sahi and Ragada Sahi for 2 years under CSR Scheme of AOCP
                 
38.49
           
17.64
334
Jagannath
Angul
Supply of 12000nos. Face mask & sodium hypochlorite 5 Ltr for the villagers against COVID-19 under CSR of JA
                 
13.26
           
13.26
335
Jagannath
Angul
Supply of 10000 (Ten thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme
                   
1.90
              
1.90
336
Jagannath
Angul
Temporary supply of water through mobile water to the villages Diajharana, Tentulei, Bhanja colony and Gurudwar Adivasi Sahi under Jagannath Area for the year 2020
                 
25.30
           
25.30
337
Jagannath
Angul
Supply of 10000 (Ten thousand) nos. of double layer cloth facemask to be distributed in the peripheral villages as preventive measures against COVID-19 under CSR Programme of Jagannath Area
                   
1.90
              
1.90
338
Kaniha
Angul
Urban plantation in Kaniha tahsil under Kaniha OCP of Kaniha Area
                 
13.28
              
5.69
339
Kaniha
Angul
Digging of pond in govt land at Aditya Prasad village
                   
7.48
              
0.34
340
Kaniha
Angul
Supply of Drinking Water through tankers to Jarada Village, Telisingha, Village,  Kansamunda Village under CSR at Kaniha OCP of Kaniha Area
                   
4.88
              
2.26
341
Kaniha
Angul
Construction of Training Hall for Skill Up gradation at Kaniha in Kaniha Block under CSR of Kaniha OCP of Kaniha Area
                 
24.21
           
24.21
342
Kaniha
Angul
Digging of drain for connecting Laxmisagar pond of Kansamunda village under CSR work of Kaniha OCP of Kaniha Area
                   
4.47
              
4.13
343
Kaniha
Angul
Supply of Drinking Water through tankers to Village Jarada, Telisingha, Chhelia, Kansamunda, Jaipur, Aditya Prasad, Gundrunali  Gulendo & Mallpasi under CSR for a period of 120 Days (Summer Season) at Kaniha OCP of Kaniha Area (Re Tender)-2020
                 
24.83
           
24.65
344
Kaniha
Angul
Supply of drinking water through tankers to Jarada, Telesingha and Kansamunda villages under Kaniha OCP
                   
4.27
              
0.51
345
Kaniha
Angul
Construction of Boundary Wall of Play ground at Arkil High School of Kaniha Block of Kaniha OCP of Kaniha Area under CSR Work
                 
12.30
           
11.75
346
Kaniha
Angul
Construction of Compound wall at Kothaghara of Badatiribida Village under CSR work of Kaniha OCP of Kaniha Area
                   
6.79
              
6.79
347
Kaniha
Angul
Deepening and Making Bathghat (Two) nos. in Tenteibereni Bandha at Tenteibereni Village at Kamarei GP of Kaniha OCP of Kaniha Area under CSR
                   
4.59
              
4.54
348
Kaniha
Angul
Supply of Water during summer through water tanker to Village Jarada, Telesingha, Chhelia, Kansamunda, Jaipur, Aditya Prasad, Gundurinali, Gulendo and Malipasi under Kaniha Area for the Year 2021 (Package S1)
                 
23.56
              
1.75
349
Kaniha
Angul
Construction of Hall at Pabitra Mohan School, Kaniha under CSR of Kaniha Area. (Re Tender)
                 
27.99
              
6.50
350
Kaniha
Angul
Deepening and Making Bathghat (Two) nos. in Panchayat Pond of Julibandha Village at Kamarei GP under CSR work of Kaniha OCP of Kaniha Area
                   
4.50
              
4.42
351
Lingaraj 
Angul
Supply of water to the water scarcity villages Madanmohanpur, BalungaonNua Sahi, Balungaon New Sahi  & Balungaon Khamar of Kandhal GP of Lingaraj Area
                   
8.63
              
5.20
352
Lingaraj 
Angul
Supply of water to the water scarcity villages  Balungaon including Balungaon Nua Sahi and Balungaon New Nua Sahi Near Ekadasipur and Talabeda of  Talcher Subdivision for the Year  2019,LA(Package-II) for 120 days    
                   
8.09
              
4.46
353
Lingaraj 
Angul
Supply of water to the water scarcity villages  of  Manikamara, Krishnachandrapur,Rasalpur,Dasarathipur and Ekadasipur of Talcher Subdivision for the Year 2019,LA(Package-Vi) for 120 days    
                   
4.71
              
1.14
354
Lingaraj 
Angul
Supplying of water to the water scarcity villages of kandhal,Langijoda and Jadunathpur of Talcher Sub-division for the year 2019 Lingaraj Area(Pkg-III) for 120 days.
                 
12.34
              
4.58
355
Lingaraj 
Angul
Supplying of Water to the water Scarcity villages Balungaon Khamar Anadipur,Soubhagya nagar & Talaberana of Talcher Subdivision for the year 2019 LA(Pkg-I)for 120 days
                   
6.01
              
1.27
356
Lingaraj 
Angul
Supplying of water to the Water Scarcity Villages of Kandhal Hadi Sahi and Gopal Sahi of Talcher Sub division for the year 2019 LA (Pkg-IV) for 120 days
                   
6.36
              
1.48
357
Lingaraj 
Angul
Supplying of water to the Water Scarcity Villages Bidyadharapur,Dayanidhipur,Doblin & Promodprasad of Talcher Sub division for the year 2019 LA (Pkg-V) for 120 days
                   
6.11
              
1.32
358
Lingaraj 
Angul
Supply of water to the water scarcity villages Langijoda of Kandhal GP of Lingaraj Area
                   
2.17
              
0.04
359
Lingaraj 
Angul
Water supply to village Kankili (part-a) and Sainali of Talcher sub division 
                   
5.22
              
5.16
360
Lingaraj 
Angul
Water supply to village Dharampur and Khairapali of Talcher sub division 
                   
4.42
              
4.39
361
Lingaraj 
Angul
Supply of water to the village Kandal Hadi Sahi, Anadipur and Madanmohanpur (Khajuria sahi & Gopal sahi ) of Talcher for 2020 
                 
11.55
           
10.85
362
Lingaraj 
Angul
Supply of water to village Kishoripal, Hariharpur and Gunthabahal of Talcher for 2020 
                 
10.67
           
10.49
363
Lingaraj 
Angul
Water supply to water scarcity village. 
                 
10.74
           
10.51
364
Lingaraj 
Angul
Water supply to water scarcity village Scotlandpur, Raselpur Dasrathipur, Ekadasipur
                 
11.86
           
11.59
365
Lingaraj 
Angul
Supply of water to Bidyadharpur, Dayanidhipur, New Dayanidhipur, Doblin & Pramod Prasad
                   
5.96
              
5.96
366
Lingaraj 
Angul
Supply of water Jandabahal & Scotlandpur
                   
5.68
              
5.67
367
Lingaraj 
Angul
Supply of water to village Kandhal, Langijoda, and Jadunathpur of Talcher for 2020 
                 
16.81
           
16.81
368
Lingaraj 
Angul
Supply of water scarcity wards of Talcher municipality during summer season for the year 2020
                 
87.50
           
65.00
369
Lingaraj 
Angul
Supply of waterto village Kankili (part-b) and Kalandi Prasad of Talcher for 2020 
                 
17.28
           
17.10
370
Lingaraj 
Angul
Supply of water to village, Balijodi, Kakudi and Biharipur of Talcher subdivision. 
                   
5.75
              
5.65
371
Lingaraj 
Angul
Supply of water to village Scotlandpur, Dharampur GP, Nuasahi Kankili and Sareilo of Talcher Sub Division. 
                   
5.61
              
5.53
372
Lingaraj 
Angul
Supplying of water to the water scarcity villages of kandhal,Hadi Sahi,Anadipur and Madanmohanpur(Khajuria Sahi & Gopal Sahi) of Talcher Sub-division for the year 2020 Lingaraj Area(Pkg-IV) for 122 days.
                 
11.55
              
1.73
373
Lingaraj 
Angul
Supplying of water to the water scarcity villages Balungaon including Balungao Nua Sahi & Balunga New Sahi near Ekadasipur and Talabeda of  Talcher Sub-division for the year 2020 Lingaraj Area(Pkg-II) for 122 days.
                   
4.15
              
0.81
374
Lingaraj 
Angul
Supplying of water to the water scarcity villages Balungaon Khamar,Anandapur,Soubhagyanagar and Talaberana of Talcher Sub-division for the year 2020 Lingaraj Area(Pkg-I) for 122 days.
                   
6.97
              
1.63
375
Lingaraj 
Angul
Supplying of water to the water scarcity villages Langijoda and Anadipur to Talcher Sub-division for the year 2020-21 Lingaraj Area(Pkg-IV) for 303 days.
                 
13.70
              
6.89
376
Lingaraj 
Angul
Supplying of water to the water scarcity villages Balungaon Sahi New Balungaon New Sahi & Soubhagya Nagar of Talcher Sub-division for the year 2020-21 Lingaraj Area(Pkg-II) for 303 days.
                 
10.95
              
4.38
377
Lingaraj 
Angul
Supplying of water to the water scarcity villages Kandhal Hadi Sahi of Talcher Sub-division for the year 2020-21 Lingaraj Area(Pkg-III) for 303 days.
                 
16.28
              
8.63
378
Lingaraj 
Angul
Supplying of water to the water scarcity villages Balungaon Khamar of Talcher Sub-division for the year 2020-21 Lingaraj Area(Pkg-I for  303 days
                   
8.28
              
2.73
379
Lingaraj 
Angul
Supplying of water to the water scarcity villages Krishnachandrapur,Dasarathipur and Ekadasipur of  Talcher Sub-division for the year 2020-21 Lingaraj Area(Pkg-iv) for 120 days.
                   
2.21
              
2.21
380
Lingaraj 
Angul
Supplying of water to the water scarcity villages Doblin,Promod Prasad,Manikamara and Rasulpur & Talcher Sub-division for the year 2020-21 Lingaraj Area(Pkg-00-3) for 120 days.
                   
3.01
              
3.01
381
Lingaraj 
Angul
Supplying of water to the water scarcity villages Jadunathpur,Bidyadharpur,Dayanidhipur and New Dayanidhipur Talcher Sub-division for the year 2020-21 Lingaraj Area(Pkg- for the year 2020-21 LA`
                   
4.77
              
4.77
382
Lingaraj 
Angul
Supplying of water to the water scarcity villages Anandapur Talabeda and Talaberana of Talcher Sub-division for the year 2020-21 Lingaraj Area(Pkg-w-I for  120 days
                   
4.98
              
0.75
383
Lingaraj 
Angul
Supplying of water to the water scarcity villages Madanmohanpur of Talcher Sub-division for the year 2020-21 Lingaraj Area(Pkg-V for  303 days
                   
8.27
              
2.73
384
Lingaraj 
Angul
Construction of drain from Sani Mandir to Anandapur under CSR
                 
45.34
              
0.20
385
Lingaraj 
Angul
CC road from Dayanidhipur New Village to Old Basti
                 
24.23
              
0.00
386
Lingaraj 
Angul
Construction of Kitchen Room at Kandhal Primary School under CSR Work L.A.
                   
6.71
              
0.01
387
Lingaraj 
Angul
Towards social welfare work by Mahila Mandal, Lingraj Area
                   
0.15
              
0.15
388
Lingaraj 
Angul
Complete wiring of newly constructed of kalyanmandap at Balunga Khamar village under CSR scheme of Lingraj Area, 
                   
1.68
              
1.67
389
Lingaraj 
Angul
Construction of community centre at village Talaberena 
                   
9.77
              
9.54
390
Lingaraj 
Angul
Construction of cement concrete road from black top road to Balunga Pathagara 
                   
8.92
              
8.72
391
Lingaraj 
Angul
Widening of road from Jatra padia to nh-149 via Anandapur 
                 
12.15
           
12.01
392
Lingaraj 
Angul
Diversion of 3.3kv overhead line of Campasi feeder to provide site clearance for completion of CHP-silo Railway connectivity of Lingraj Area
                   
3.26
              
3.26
393
Lingaraj 
Angul
Lighting of Bansidhar Yubak sangha playground by providing and erection of lighting pole and light 
                   
2.76
              
2.76
394
Lingaraj 
Angul
Providing of street lighting at Talaberna new Basti of Langijoda village under 
                   
5.14
              
5.14
395
Lingaraj 
Angul
Providing approach road to burial ground of Talabeda under 
                   
6.38
              
6.34
396
Lingaraj 
Angul
Widening of road from Talabeda Brahman Sahi to NH 
                   
9.25
              
9.18
397
Lingaraj 
Angul
Construction of cement concrete Road from Balungaon Top Road at Balungaon Pathaghara under CSR work LA.
                   
8.92
              
1.00
398
Lingaraj 
Angul
Construction of Shoulder on both sides of Road along NH-149 on a length of 2.5km between Pabitra Mohan Chhaka to Bankadhara Chhaka Lingaraj Area as a CSR initiative of MCL
              
138.60
         
124.74
399
Lingaraj 
Angul
Construction of Community Centre at Village Talaberana under CSR Work LA
                   
9.77
              
1.22
400
Lingaraj 
Angul
Construction of CC Road from R.D.Road to Kishoripal drain under CSR work L.A.
                   
6.83
              
6.83
401
Lingaraj 
Angul
Construction of Toilet at Anganwadi Kendra Kandhal and Talabeda under CSR Work LA
                   
5.60
              
5.60
402
Lingaraj 
Angul
Making of Children Park at Vill:Talaberana under CSR Work LA
                 
16.53
              
9.00
403
Lingaraj 
Angul
Towards house rent from nov'17 to sept'18 i.e. 11 months for accomodation of Balunga Primary School.
                   
0.55
              
0.50
404
Lingaraj 
Angul
Supply of sweater cardigan for ladies for social welfare activities under CSR through Mahila Mandal
                   
0.24
              
0.24
405
Lingaraj 
Angul
Supply of sanitary pad
                   
0.06
              
0.06
406
Lingaraj 
Angul
Supply of wheel chair with folded system & walking stick through Mahila Mandal
                   
0.20
              
0.20
407
HQ
Angul
Providing assistance to ‘Mahanadi Medical Education Trust’ (MMET) for appointment of Tax Consultant for obtaining PAN and Exemption under Section 12A of Income Tax Act 
                   
1.18
              
1.18
408
HQ
Angul
Expenditure incurred in Bio-medical waste  management st MCL funded at COVID- Hospital , Talcher 
                   
7.19
              
7.19
409
HQ
Angul
Construction of science laboratory at Sri. Aurobindo Integral School, Matrubhumi, Dera
                 
22.00
           
22.00
410
HQ
Angul
Providing laboratory equipments to the newly constructed science lab at Sri Aurobindo Integrated Education and Research Centre, Dera
                   
2.29
              
2.29
411
HQ
Angul
Operationalisation of COVID-19 Hospital at Talcher by SUM Hospital 
           
1,281.79
     
1,281.79
412
HQ
Angul
Rural Piped Water supply Scheme to Santhapada and its adjoining villages under  Talcher Block in the Angul district 
              
900.92
         
218.86
413
HQ
Angul
2 nos. Piped Water Supply Schemes for 35 villages of Talcher and Kaniha Block of Angul district.
           
5,505.58
         
747.49
414
HQ
Angul
Rural Piped Water supply Scheme to Gurujang and its adjoining villages under  Talcher Block in the Angul district 
              
478.96
              
0.28
415
HQ
Balasore
Installation of water vending machine at Balasore
                 
11.40
           
11.40
416
HQ
Bargarh
Distribution of 10,000 masks to the villagers of Bargarh district
                   
1.89
              
1.89
417
HQ
Bargarh
Furniture for Saraswati Sishu Mandir, Attabira
                   
5.98
              
5.98
418
HQ
Bargarh
Construction of Hostel building at Lokakabi Haldar Avasik Banavidyalaya, Kudopali, Bargarh  
                 
21.27
           
10.64
419
HQ
Bargarh
Construction of Community centre, Sugar mill Road, Tora, Bargarh under CSR
                 
22.67
           
11.08
420
HQ
Bargarh
Construction of of class room at Panchayat High School, Ganthiapali, Bijepur block, Bargarh
                 
21.00
              
2.10
421
HQ
Bargarh
Construction of Auditorium at George High School, Bargarh
                 
21.85
           
10.93
422
HQ
Bargarh
Construction of community hall at Canal Road, Barpali, Bargarh 
                   
9.76
              
1.46
423
HQ
Bargarh
Construction of Kalyan mandap Haldipali Zeera Bridge.
                 
23.78
           
11.89
424
HQ
Bargarh
Construction of damaged front Boundary wall & main gate of PH School Bargarh under CSR fund of MCL
                   
8.00
              
8.00
425
HQ
Deogarh
Distribution of 10,000 face masks to the people of Deogarh constituency
                   
1.88
              
1.88
426
HQ
Deogarh
Provision of vehicle to the District Red Cross Blood bank, Deogarh
                 
13.30
           
13.30
427
HQ
Dhenkanal
Kamakhya Nagar district Stadium, Dhenkanal
                 
24.38
           
24.38
428
HQ
Dhenkanal
Development work in different Gram Panchayat of Kamakshya Nagar block of Dhenkanal under CSR of MCL Phase I
                 
18.00
           
18.00
429
HQ
Dhenkanal
Development work in different Gram Panchayat of Kamakshya Nagar block of Dhenkanal under CSR of MCL Phase II
                 
18.00
           
18.00
430
HQ
Jharsuguda
Providing medical equipments for MCL Lakhanpur Covid hospital
                 
22.83
           
22.83
431
HQ
Jharsuguda
Construction of Community Centre and Boundary wall at JSG.
              
690.00
         
211.88
432
HQ
Jharsuguda
RDC Approved work at Jharsuguda in Lakhanpur Block (by Lakhanpur Area & IB Valley area) 
              
817.12
         
101.37
433
HQ
Jharsuguda
RDC Approved work at Jharsuguda in Lakhanpur Block (by Orient area)
              
380.83
           
48.55
434
HQ
Jharsuguda
Additional fund for development work at kolabira, Laikerea, Kirmira and Jharsuguda block.
              
672.00
           
17.17
435
HQ
Jharsuguda
Construction of District Stadium, Jharsuguda
           
1,564.86
           
48.80
436
HQ
Jharsuguda
Providing sustainable livelihood to the targeted landless family Sukhbasi residing on MCL acquired area as a CSR initiatives of MCL
           
1,422.00
         
126.00
437
HQ
Jharsuguda
Zilla Mahotsav 2020 - JSG
                 
10.00
           
10.00
438
HQ
Khurda
Implementation of afforestation activities at BBSR during 2017-18 by DFO, Chandaka WL Division, BBSR 
              
218.83
           
55.75
439
HQ
Khurda
Implementation of afforestation activities at BBSR during 2018-19 by DFO, Chandaka WL Division, BBSR 
              
299.99
           
23.01
440
HQ
Khurda
Implementation of Afforestation activities i.e. raising Urban Plantation during the year 2018-19 by DFO, City Forest Division Bhubaneswar
              
241.65
           
44.27
441
HQ
Khurda
Financial assistance for creche/School for poor and slum Children of Bhubaneswar run by Sebaghar, the IAS Officers' wives' association.
                   
6.50
              
6.50
442
HQ
Khurda
Operationalisation of COVID-19 Hospital at Bhubaneswar by SUM Hospital 
        
12,179.40
   
12,074.40
443
HQ
Khurda
Operation of toy train in Nandankanan
              
300.00
           
91.50
444
HQ
Mayurbhanj
Financial assistance to Ayush Pattanayak for training in badminton
                   
1.60
              
1.60
445
HQ
Nuapada
Projects under the scheme of Development of Aspirational Districts by CPSEs in Nuapada district
              
571.00
         
124.48
446
HQ
Puri
Arrangement of DG set by different Area of MCL on urgent basis for Fani affected Areas on request from State Authority, under CSR fund of MCL
                 
11.89
              
0.44
447
HQ
Sambalpur
Completion of auditorium at Kalaparishad, Sambalpur
              
287.78
           
33.76
448
HQ
Sambalpur
Groceries for stranded workforce at const. site  in Sambalpur 
                   
0.05
              
0.05
449
HQ
Sambalpur
Supply of T-shirt during Swachhta Hi Seva
                   
0.31
              
0.31
450
HQ
Sambalpur
Procurement of T-shirt for candidates selected for Handyman project
                   
0.13
              
0.13
451
HQ
Sambalpur
Distribution of sweater to the poor men & women living in and around Burla
                   
3.44
              
3.44
452
HQ
Sambalpur
Construction of Old age home for women at Phuljharan in Jujumura block of Sambalpur
                 
72.76
           
53.74
453
HQ
Sambalpur
Construction of 2 nos toilet block in Dr.Isac Santra Balniketan
                 
14.02
           
14.02
454
HQ
Sambalpur
Construction of 4 nos class room and a multipurpose hall at Saraswati Sishu Mandir, Burla
                 
86.38
           
86.38
455
HQ
Sambalpur
Repairing of existing school building & provision of a ladies hostel toilet at Sumati Behra High School
                 
13.95
           
13.95
456
HQ
Sambalpur
Construction of class room. Kitchen, dining shed & providing desk-benches at Mirdhapada Primary School
                 
24.33
           
24.33
457
HQ
Sambalpur
Construction of toilet blocks and modification of cycle stand at New Rampella Nodal High School
                 
17.32
           
17.32
458
HQ
Sambalpur
Construction of additional housing for children at Specialized Adoption Agency (SAA), Chhachanpalli
                 
42.47
           
42.47
459
HQ
Sambalpur
Constriction of CC road at Kirba village
                 
20.18
           
19.72
460
HQ
Sambalpur
Kayakalp, a comprehensive scheme for development of adopted village Basantpur
              
113.46
           
51.06
461
HQ
Sambalpur
construction of compound wall and concrete pathway inside the premises of Ladies Hostel of Sambalpur University
                 
28.53
           
28.53
462
HQ
Sambalpur
Plantation of trees in vacant site in school campus of Sri.Aurobindo School, Matrukhetra
                   
0.06
              
0.06
463
HQ
Sambalpur
Providing 10,000 face masks in different rural and urban areas of Bargarh district 
                   
1.68
              
1.68
464
HQ
Sambalpur
Awareness  campaign, counseling & screening of HIV/Aids in the near by Areas of MCL
                 
10.00
           
10.00
465
HQ
Sambalpur
Providing toilet washroom enabled porta cabins at the proposed COVID-19 isolation facility
                 
18.63
           
18.63
466
HQ
Sambalpur
Payment towards arrangement of food during Jaundice prevention camp in Sambalpur 
                 
10.51
           
10.51
467
HQ
Sambalpur
Providing 05 thermal scanners to distt admn, Sambalpur 
                   
0.29
              
0.29
468
HQ
Sambalpur
Payment towards taxi engaged during spreading of Jaundice in Sambalpur
                   
2.82
              
2.82
469
HQ
Sambalpur
Payment towards taxi engaged during spreading of Jaundice in Sambalpur
                   
3.85
              
3.85
470
HQ
Sambalpur
Supply of 2800 nos umbrella to ASHA and Anganwadi workers of Sambalpur
                   
5.32
              
5.32
471
HQ
Sambalpur
Providing food packets to the migrant labours travelling in Shramik express passing through Sambalpur Railway Station
                   
4.97
              
4.97
472
HQ
Sambalpur
Supply of 10000 Favipiravir tablets to DCH Sambalpur and CCC Puhala, VSSUT Burla
                   
2.56
              
2.56
473
HQ
Sambalpur
Supply of PPE kits to DHH, Sambalpur
                   
9.41
              
9.41
474
HQ
Sambalpur
Supply of sanitary pads during swachh Bharat Abhiyan
                   
2.44
              
2.44
475
HQ
Sambalpur
Construction of Ladies hostel in Sambalpur University
              
547.27
           
76.93
476
HQ
Sambalpur
Providing Desk cum benches to 20 anganwadis of Sambalpur
                   
2.84
              
2.84
477
HQ
Sambalpur
Construction of three nos. of classrooms and a toilet block at Sri Aurobindo integral Education and Research Centre, Udiyman Martrukhetra, Dist-Sambalpur 
                 
22.52
           
15.73
478
HQ
Sambalpur
Construction of additional classrooms at Sri Aurobindo integral Education and Research Centre, Burla, Dist-Sambalpur 
                 
13.66
              
0.68
479
HQ
Sambalpur
Construction of water treatment plant at Burla
              
862.10
         
110.45
480
HQ
Sambalpur
Construction of 1st Floor above Swadheenta Sangrami (Freedom Fighter Memorial) Hall, Sambalpur
                 
32.98
           
12.05
481
HQ
Sambalpur
Supply of tools for Elephants Menace control 
                   
4.78
              
0.72
482
HQ
Sambalpur
Providing 1000 nos tree guards for sampling in and around SBP under CSR fund of MCL
                   
3.33
              
3.33
483
HQ
Sambalpur
Financial assistance for promotion & development of traditional arts, culture & handicraft in SBP district
                 
10.00
           
10.00
484
HQ
Sambalpur
Financial assistance to District Red Cross Branch, Sambalpur
                   
2.00
              
2.00
485
HQ
Sambalpur
Financial assistance towards 'Lok Mahotsav - 2020'
                   
7.00
              
7.00
486
HQ
Sambalpur
1 year warranty expenditure of Hirakud ropeway project between Jawahar Udyan & Gandhiminar at Hirakud dam complex
                 
60.00
           
55.55
487
HQ
Sambalpur
Development of Sports facility at Patit Khel Padia (play ground) near Charbati, Sambalpur
                 
38.80
              
5.50
488
HQ
Sambalpur
Installation of statue of APJ Abdul Kalam, Hon’ble Ex-President India at CSB Zilla High School Square, Sambalpur with an approximate cost of Rs. 24 lakhs.
                 
24.00
           
20.40
489
HQ
Sambalpur
Renovation of road & drain in side the School campus of Saint Joseph's convent Higher Secondary School, SBP under CSR of MCL
                 
10.91
              
1.64
490
HQ
Sambalpur
Construction of sports Complex at Burla (Boundary wall for the Sports Complex Rs 79.86 lakh)
           
2,500.00
         
200.00
491
HQ
Sambalpur
Supply installation & commissioning of Solar LED street light at different places of Sason, ranikhinda, Sambalpur under CSR of MCL.
                   
5.10
              
4.88
492
HQ
Sambalpur
Supply of Genset & Air cooler to 'Urban Primary Health Centers' of Sambalpur distt for providing infra for healthcare during Covid-19
                 
12.41
           
12.41
493
HQ
Sambalpur
Provision of Self employment to the Persons with Disabilities (PWDs) through providing e-rickshaw
                 
25.09
           
17.85
494
HQ
Sambalpur
Financial assistance for infrastructural development of CCB form PUPS School, Chipilima, Basantpur Sambalpur under CSR of MCL.
                   
4.96
              
4.96
495
HQ
Sambalpur
Implementation of Afforestation activities i.e. raising Urban Plantation during the year 2017-18 by DFO, Sambalpur Wildlife Division
                 
57.80
           
15.30
496
HQ
Sambalpur
Implementation of Afforestation activities i.e. raising Urban Plantation during the year 2018-19 by DFO, Sambalpur Wildlife Division
                 
83.49
           
45.55
497
HQ
Sundargarh
Providing 11,600 facemasks for villagers of Sundargarh district
                   
2.00
              
2.00
498
HQ
Sundargarh
Aahar Mandal, an initiative of promoting organic farming among rural community of hemgir block, sundargarh district under CSR of MCL
                 
23.39
              
7.02
499
HQ
Sundargarh
RDC Approved work at Sundergarh for the FY 2016-17 (Sankara RP Line)
           
1,629.00
         
502.59
500
HQ
Sundargarh
Supporting Technology Business Incubator  (FTBI) at Rourkela NIT
              
261.00
         
121.66
501
HQ
 
Sundargarh & Jharsuguda 
Construction of Toilet & bathroom components along with connected administration & management expense as part of ongoing project of sustainable development works in operational district by Gram Vikash
              
253.13
           
89.05
502
HQ
14 DISTRICT
Construction of toilet block in 14 district of Odihsa by OPEPA
           
7,067.34
           
23.44
503
HQ
Sambalpur, Sundargarh, Jharsuguda & Angul
Comprehensive community development  programme (CCDP-UTHAN) as a CSR initiative of MCL  Sustainable Development Work for livelihood enhancement
           
2,028.63
         
149.59
504
HQ
Sambalpur, Sundargarh, Jharsuguda & Angul
Providing 5000 food grain packets as a CSR initiative to stranded migrant families affected by Covid-19 lockdown
                 
24.01
           
24.01
505
HQ
Sambalpur, Sundargarh, Jharsuguda & Angul
Providing 2 layer cotton mask for distributing in peripheral area during Swachta month
                 
24.00
           
24.00
506
HQ
Sambalpur, Sundargarh, Jharsuguda & Angul
Supply of book during Swachhta Month'20
                   
0.24
              
0.24
507
HQ
Angul
Construction of Medical College(MIMSR) at Talcher
        
49,262.00
         
118.56
Total
      1,02,220.09    20,533.75